Short answer: the lowest unit price is not the lowest cost if the quotation covers a different variant, excludes packing or carries no evidence. Compare the scope line by line before comparing the total.
Compare scope before price
Put the quotations into the same structure: reference, variant, quantity, packing, documents, lead time and exclusions. A quote that cannot be mapped to the RFQ line is not comparable yet.
Reference and variant confirmation
Check that every supplier quoted the full reference and the same suffix. A lower price for a plain ring is not a lower price for a coated ring. If a supplier proposes a cross-reference, ask for the basis of the mapping.
What is included
The same part can arrive with different packing, documentation and inspection. Make the differences visible.
| Line | Compare |
|---|---|
| Part | Reference, suffix and variant |
| Quantity | Units per line and total |
| Packing | Bag, carton, case, protection |
| Documents | Packing list, invoice, certificate |
| Inspection | Who checks and against what |
| Delivery | Lead time, shipment and Incoterm |
Lead time, packing and documentation
A short lead time with inadequate packing can cost more than a longer, protected shipment. Ask what happens if a carton is damaged or a document is missing. The cheapest quote may also exclude the certificate or inspection you need.
Quality evidence
Ask what the supplier can show for the actual reference: catalogue line, drawing, photos, previous order record or inspection note. Do not accept a generic certificate as proof for a specific line. The quality and interchange page explains the evidence boundary.
Red flags
These are reasons to pause, not automatic rejections, but they need an answer before a PO.
- A different suffix without explanation.
- A cross-reference presented as OEM approval.
- No packing or document detail.
- A certificate that does not name the reference.
- A price that cannot be explained by scope.
A simple decision matrix
Score each quote on the same lines and keep the evidence with the score.
| Criterion | What good looks like |
|---|---|
A five-step quote comparison
Normalize first, compare second. A quote can look cheaper because it covers a different variant, excludes packing or carries no evidence.
- Map every quote line to the same RFQ line.
- Confirm the reference and suffix on each line.
- List what is included: part, packing, documents, inspection.
- Compare lead time, shipment basis and exclusions.
- Score the evidence behind any cross-reference.
Normalize the scope
Put the quotes into one table before comparing totals. If a line cannot be mapped to the RFQ, it is not comparable yet.
| Line | What to compare |
|---|---|
| Reference | Base number and suffix |
| Variant | Coating, tooth count or kit contents |
| Quantity | Units per line and total |
| Packing | Protection and labeling |
| Documents | Packing list, invoice, certificate |
| Delivery | Lead time, shipment and Incoterm |
Quality evidence and red flags
Evidence should name the reference. A generic certificate or a cross-reference is not proof for a specific line.
- A different suffix without explanation.
- A cross-reference presented as OEM approval.
- No packing or document detail.
- A certificate that does not name the reference.
- A price that cannot be explained by scope.
A simple decision matrix
Score each quote on the same criteria and keep the evidence with the score. The lowest price may still be the highest total cost if the scope is incomplete.
| Criterion | What good looks like |
|---|---|
| Reference match | Full reference and suffix confirmed |
| Scope | Packing, documents and inspection stated |
| Evidence | Reference-specific evidence supplied |
| Delivery | Lead time and Incoterm clear |
| Communication | Questions answered with specifics |
Common comparison errors
These errors make a comparison look objective when it is not.
- Comparing totals before comparing scope.
- Ignoring a different suffix or kit contents.
- Assuming all quotes include packing and documents.
- Accepting a certificate that does not name the reference.
- Letting a short lead time hide an incomplete scope.

How this differs from RFQ preparation
The RFQ checklist prepares the question. This guide evaluates the answers. For the reference evidence behind a proposed cross-reference, use the OEM vs cross-reference guide.
A practical comparison meeting
Put the quotes side by side in one table and remove any line that cannot be mapped to the RFQ. Discuss the differences in scope before discussing the total. A short meeting with procurement and receiving is enough.
The output should be a preferred quote, a list of open questions and a clear reason for the choice. If the reason is only price, the comparison is not finished; the scope and evidence still need to be checked.
- Normalize every line to the RFQ.
- Mark confirmed and unconfirmed variants.
- List packing, documents and inspection differences.
- Record the evidence behind each cross-reference.
- Agree the next question before choosing a supplier.
Documenting the final choice
Write down why the preferred quote was chosen. The reason should reference the scope and evidence, not only the total. This record is useful when a colleague asks later why a higher-priced quote was selected.
Keep the open questions with the decision. A quote can be preferred conditionally; the condition should be visible rather than buried in an email thread.
- Preferred quote and total scope.
- Reference and variant confirmation.
- Packing, documents and delivery differences.
- Open questions and owner.
- Decision date and next review point.
Bottom line
Compare scope first, price second. A quote that excludes packing, documents or inspection is not comparable to one that includes them. Record the evidence and the open questions, then choose the quote that can actually be checked.
One last check before choosing
Confirm that the scope and evidence are complete for the preferred quote. If the only reason for the choice is price, the comparison is not finished; return to the scope table and close the open questions first.
Need a reference checked? Send the assembly details, the stamped reference and photos of the old part. We confirm what the reference covers before quoting.